Let me catch you up!!

So it’s been a little over a month since we closed on our amazing fixer upper in the heart of historical Aberdeen gardens. After weeks of looking online and viewing homes we found this home online and requested our realtor set up a viewing, after seeing the home and lot size we fell in love with the potential of this house and put it at the top of our list of potential homes. After looking at several other properties we determined that this house was the one for us. The type of loan that we decided to chose meant we needed a Class A contractor to take on the task of repairing and rebuilding the home to make it functional and inhabitable for our family. We came to this house so many times with different contractors and explained to them our vision for the home and asked for quotes to make our dreams come true. Time and time again we were met with ridiculously inflated costs and unrealistic budgets. Frustrated and eager to get the ball rolling on the property we even paid a deposit to a contractor to come and look at the home. After explaining to him that we were constrained to the financial budget provided by loan amount and nothing more and expressing to him what our maximum budget was (we gave him a ballpark and not an exact amount) he gave us an estimate for double the amount that we talked about. So basically we paid you to tell us that our budget is not enough? Thanks for nothing mr. To add another hitch in our plans we find out that someone is trying to offer a lower all cash offer on the home with no inspection. We suspect one of the contractors we brought out recognized what a good deal this home was and how much potential it has and they tried to undercut us. So just like that the home slips from our grasp and we begin to browse the online sites again in the hopes that we can find another home just like it. A few days later a call from the real estate agent puts the wind back in our sails and we are in contention for the home. The cash offer had fallen through and it looked like we were finally home free! At the same time while talking to one of his customers at work my boyfriend found out that he worked for a Class A contractor that does fixer-uppers all the time! How fortunate for us huh? So in a few days we were able to get him to come look at the home and give us a quote. As he walked through the home he was very positive about the potential we saw in the home he even dialed up one of his associates and asked for an estimate to remove the asbestos on the home. Like super awesome right?! Once he gave us the quote we knew we needed to seal the deal on this house and get this work started as soon as possible. There was some back and forth with the bank and the real estate agent and the inspector but after 2 extensions and a title issue we finally had the green light to close on our home!! So after the signing of what seemed like 1,000 pages of legal documents to secure the loan and ownership of the house we were ready for construction to begin. 2 days later there was a dumpster in our backyard and walls were coming down and floors were being pulled up!. Since the home was a foreclosure and basically abandoned for an extended period there was little to demo in the kitchen besides some leftover cabinets. The wall between the kitchen and living room was torn down to create an open concept living and kitchen space. I was so anxious about everything going on I went past the house everyday to check on the progress, except the days that I was forbidden to come due to asbestos abatement and the danger of being in the home during that time. After a short interruption in work to secure some more permits we are back in the swing of things and new things are going on daily. All of the dingy old carpet has been ripped out. Both bathrooms were gutted and the upstairs one now has a plywood floor. Yay. Our new master closet has been roughed in. Can I mention our closet is framed in exposed brick! I’m so in love! I met with the HVAC installers and decided on placement of the mini-split units we ordered for upstairs and was able to get a sneak peek of the outside unit that would run those mini-split systems. I also met with the cabinet maker and designed our cabinet and island! I cannot wait to see how it all comes out! In addition to buying this house which comes with and attached garage it also has a detached garage as well. Score! And it backs up to a big lot space and trees. The back area is being turned into a garden that I am so excited to start!!! While rummaging through the upstairs loft space above the garage we found some items that we are actually gonna keep and refinish and put back into the the home and I cannot wait to post those upcoming projects. Also let me just say Mason Jars!!! Score 1 for me on this amazing find.Did I forget to mention the awesome sunroom off the front porch? I cannot wait to sit out there and enjoy that space!! Sorry this post was so long but I wanted to make sure I posted as much information as I could so you guys could follow along on this exciting amazing journey!! 
Thanks for reading, hope you come back as I’ll be posting more frequent updates as everything happens!

 

The front of our home before the remodel
  
Inside of the living area and the stairs.
  
The kitchen and that awful floor, lol
  

 

Upstairs bathroom
 
  
Downstairs bathroom
  
Old den that we will convert to our Master Bedroom
    
      
    
 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s